Asbestos Consulting
At G3 Environmental(G3) we provide our clients with a broad spectrum of cost-effective services to manage asbestos-related issues. Our experienced staff includes AHERA Asbestos Inspectors, AHERA Management Planners, and AHERA Project Designers and AHERA Contractor Supervisors. Our team has extensive experience in providing asbestos management solutions for medical, industrial, institutional, commercial, residential and private sector clients.

BUILDING INSPECTIONS/SURVEY
G3’s staff has extensive experience in providing asbestos inspections/surveys and management services in conjunction with demolition and renovation projects. Prior to renovation or demolition, affected areas must be inspected for the presence or absence of asbestos-containing materials (ACM). In Maricopa County the building owner/operator must have an inspection or re-inspection within the last 12 months G3’s staff has extensive experience in providing asbestos inspections/surveys and management services in conjunction with demolition and renovation projects. Prior to renovation or demolition, affected areas must be inspected for the presence or absence of asbestos-containing materials (ACM). In Maricopa County the building owner/operator must have an inspection or re-inspection within the last 12 months (REGARDLESS OF THE DATE OF CONSTUCTION) before starting any renovation or demolition projects. Based on survey information and the type of project, an abatement specification or management plan is developed. before starting any renovation or demolition projects. Based on survey information and the type of project, an abatement specification or management plan is developed.
- Planned Renovation Inspections
-
Emergency Renovation Inspections/Bulk Sampling
(fire and flood damaged homes and facilities) - OHSA/NESHAP Compliance
- AHERA Inspections, AHERA Periodic Inspections and AHERA 3 Year Re-Inspections
- Comprehensive Demolition Inspections
- Comprehensive Operations & Maintenance Programs
- CADD Drawings Showing Sample Locations and Asbestos Material Locations and Quantities
EPA 40 CFR 61.145 (a)
“…the owner or operator of a demolition or renovation activity and prior to the commencement of the demolition or renovation, thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos, including Category I and Category II non-friable ACM.” *(All facilities, regardless of the date of construction)
PLANS, SPECIFICATIONS
AND BIDDING DOCUMENTS
ABATEMENT PROJECT
MANAGEMENT
G3 will coordinate and manage all phases of the asbestos abatement project. Before abatement work begins, G3 personnel ensure that the containment and decontamination chambers are appropriately constructed.
During the project, the G3 field technician performs daily air monitoring inside and outside the containment, observing and documenting the contractor’s daily activities to make certain the work is appropriately performed. Once abatement is completed and before the containment is removed, the G3 field technician performs a visual inspection and final clearance air sampling of the work area to make certain the work area is safe for re-occupancy.
G3 will coordinate and manage all phases of the asbestos abatement project. Before abatement work begins, G3 personnel ensure that the containment and decontamination chambers are appropriately constructed.
OPERATIONS & MAINTENANCE
PROGRAMS
We offer asbestos Operations and Maintenance (O&M) Program services that are tailored to our clients’ needs. Our O&M Programs are completed in a comprehensible language that details specific procedures and training requirements. Services provided by G3 include asbestos O&M training, asbestos awareness training, and O&M Program monitoring.
- Re-Inspections
- Client Consultation
- Management Planning
- Personnel Training
- Program Monitoring
- ADEQ
ABATEMENT OVERSIGHT SERVICES
- Inspection Verification
- Client Consultation
- Specification Design
- Bid Document Preparation
- Pre-Bid and Pre-Construction Meeting
- Abatement Project Management
- Prevalent Air Monitoring
- Work Area Air Monitoring
- Final Visual and Air Clearance Sampling
- On site PCM Air Sample Analysis
- Project Documentation